Condition

On a vessel of at least 1,000 HP, or in a laboratory or workshop.

Performance requirement

Behavior Standard
The student will: During assessment, the student shall, at a minimum:

Start and Secure the sewage wastetreatment plant.

  • Describes the vessel’s environmental compliance plan and how it relates to the sewage waste-treatment plant;

  • Ensures that the plan reflects proper sequences of actions are complete, and that it conforms to the directions and requirements of both the manufacturer’s instructions and ship’s procedures;

  • Successfully puts into service and secures the sewage waste- treatment according to plan;

  • Correctly describes the actions as they are being performed; and

  • Takes proper action to prevent safety and pollution violations.

Location

Assessed in EN‑2231 Sea Term II: Marine Engineering.

References

STCW Knowledge, Understanding and Proficiency

  1. OICEW-D1
  2. OICEW-D1.2

NVIC Tasks

  1. NVIC 17-14 Task 10.1.A Start and secure sewage treatment system